Thank you for joining Laura's session, "Powering Data Centres with a Grid Under Pressure" at Solar and Storage London 2026.
Latest industry insights

How Spain’s flexible access permits change hybrid economics: grid constraints, Type 0 import windows and modelling solar, BESS and flexible demand in Gridcog.

Genna Boyle joins The Pexapark Podcast to explain why the grid connection is the scarce resource and how GB, Spain, Germany and Australia are responding.

Grid connections take 5–7 years; hyperscalers want power in two. How flexible and phased connections, onsite generation and flexible compute close the gap.
Case Studies

See how Sustain Commercial Solar uses Gridcog to turn behind-the-meter solar and BESS flexibility into bankable projects, with £27m of investment secured.

See how EnergyTec, WA's largest embedded network provider, uses Gridcog to model complex solar and BESS projects across major commercial and industrial property portfolios.
.jpg)
Europe-based meteocontrol accelerates Germany and Europe’s utility-scale renewable energy transition with bankable BESS revenue assessments.
















